5O years of experience in steel constructions
We are passionate about our profession. What do you get out of it? The certainty of affordable custom-made steel structures, preceded by extensive technical research if required. More about usAbout Imetaal Staalbouw B.V.
More than 55 permanent employees work at Imetaal; we also have a flexible layer of employees that we can use as desired. We have a production capacity of more than 7,000 tonnes of steel per year. We enjoy a solid market position, which continues to grow at home and abroad through the use of our knowledge, creativity and experience.
Reliable, flexible and financially strong partner
We take care of design, delivery and assembly
50 years of knowledge, creativity and experience
Expansion Phoenix Zevenaar
The Phoenix Zevenaar expansion is already taking shape. A beautiful construction of approximately 70 tons, built in phases. The floors were also laid. All work in perfect collaboration with Welling Bouw Didam. The work will be completed in the 1st
read more
Kiel am Alten Bootshafen
In Kiel am Alten Bootshafen, all the balconies of building 4 have been mounted on the facade and Innenhof and the aligning of the balconies has started. Week 43 we will start with the balconies in Innenhof building 1 (shown
read more
Progress phase 1 Kiel am Alten Bootshafen
At the construction site in Kiel, we are now fully assembling the last of the Innenhof balcony fences. We will then install the parapet gates on the 5th and 6th floors. Our goal is to be ready by week 49/50
read more
AIM Markgröningen
In Markgröningen we had to install 2 front roofs with a span of the beams of 15 meters. It was quite a challenge to connect the 15 meter long tie rods at the right angle to the 4.8 ton HEM
read more
Qurios Resort Gulpen
Monday, October 26, we delivered and assembled the construction for the reception building of Qurios Vakantieresort in Gulpen. After the wide slabs have been laid and poured, the roof construction is assembled.
read more
Progress phase 1 Baumarkt Hornbach Enschede
In Enschede, the Baumarkt is really taking shape and we are steadily building. The nets are now also hanging so that the roof plates can be mounted.
read more
Baumarkt Hornbach Enschede
Week 17 we started with the assembly Baumarkt Hornbach in Enschede. It's already starting to take shape.
read more
New production hall in Rottendorf
Construction of a warehouse for a pharmaceutical company in Ennigerloh. The substructure is built with an AT6 crane on the roof by the technical installation. Subsequently, the grating will be laid and the assembly will be completed for purchase.
read more
Ringers factory Alkmaar
Together with our client, we are renovating/conversion of the monumental Ringers factory in Alkmaar. Various substructures, new steel structures have already been installed. We are currently working on the assembly Construction Optopping. The spiral staircase has now been built in
read more
Urban Oasis Ulft
The Urban Oasis is the prototype for a city park of 300 square meters in which innovative technologies make the environment cleaner and more sustainable. The aim is to improve the quality of life in cities. A project that will
read more
Steel construction Ter Horst Varsseveld
Monday 19 October we started the assembly of the steel construction for the new hall for Ter Horst Metaaltechniek. We expect to have the assembly of the hall ready by the end of week 44. We will then start assembling
read more
Friedenauer Höhe Berlin
Update Friedenauer Hohe Berlin The balcony and roof terrace fencing has been installed. In week 42 we will start with the privacy screens BT1. It is expected that we can start installing privacy screens and balcony railing BT2 at the
read more
Toom Bochum fase 2
In week 26 we started assembling the steel construction Toom in Bochum. In 4 weeks, 271 tons of steel were installed, a best performance for the installation team. At the end of week 30, the assembly of the Windfang was
read more
AH Meijhorst
In week 38 we started assembling the steel construction AH plan Meijhorst in Nijmegen. Friday, September 18, the first part of the AH steel construction was completed to the satisfaction of the contractor. In week 42 we will start on
read more
Outdoor staircase Darmstadt
On Monday we completed the assembly of the 1st outdoor staircase 4.2 in Darmstadt. The assembly of the 2nd outside staircase type 2.2 may start in week 9.
read more
Parkhaus Edeka Moers Fase 5
Progress Parkhaus Moers until wk 26 This week, the access and exit ramps for the 8th floor will be completed at Parkhaus Moers. The beams from axis 22 to 42 are then mounted. The beams are expected to be installed
read more
Parkhaus Edeka Moers Fase 4
Progress Parkhaus Moers until wk 21 We are now fully engaged in the assembly of beams, tubes and drive-on mats on the 6th floor. By the end of this week we expect to be ready with this floor on axis
read more
Parkhaus Edeka Moers Fase 3
Week 19 2020 we have assembled the 5th floor of axis 1 to 21 and we will have this part of the assembly ready on Friday 8 May. Some of the beams have also been mounted between axis 22 and
read more
New construction Boels rental center Norderstedt
New construction Boels rental center Norderstedt Imetaal Stahlbau GmbH has again performed a wide variety of services for this construction project, such as: - Manufacture and assembly of a custom-made steel hall including concrete plinths and an industrial floor slab
read more
Lidl Lochem
Tuesday, April 14, we started assembling the steel construction for Lidl in Lochem. We expect to finish the crane work on Saturday the 18th. The bolt connections will be checked in week 17 and the assembly will also be completed.
read more
Parkhaus Edeka Moers Fase 2
Progress Parkhaus Moers until April 11 Due to the German holiday Karfreitag, it was not possible to work on the Parkhaus in Moers on Friday 10 April. On Saturday afternoon, April 11, the assembly was completed from Axis H to
read more
Parkhaus Edeka Moers Fase 1
Here some pictures of the assembly stand until wk 14 Parkhaus Edeka Moers In week 15 the assembly axis H / A (axis 21 to 42) will be ready. We will also start finalizing the 3rd floor. Due to Good
read more
Skoda & Opel Brass Dietzenbach
In week 13 we started with the installation of the first two parts at Skoda & Opel Brass in Dietzenbach. We expect to have the third part of Hall 1 ready by the end of week 14.
read more
Parkhaus Edeka Moers
In week 10 we started preparations for the installation of the Parkhaus Edeka in Moers. The first 4 loads were delivered on construction. All columns are now standing and the tubes are placed between the columns.
read more
Van Kimmenade Helmond
In week 7 we started assembling the Van Kimmenade office in Helmond. The temporary construction and construction of the first floor is now complete by the assembly team.
read more
Rudolf Steiner College Haarlem
In week 22 we started with placing the mounting columns for the Rudolf Steiner College in Haarlem. The first floor is already there. In the meantime, we started installing THQ beams on the second floor in week 27. This week
read more
Toom in Bochum
In week 26 we started with the installation of Toom in Bochum. We expect to have the assembly ready in week 29.
read more
Outdoor staircase Darmstadt
In week 5 we completed the assembly of the 1st outdoor staircase 4.2 in Darmstadt. The installation of the 2nd outdoor staircase type 2.2 may start in week 9
read more
VB Airsuspension
Progress VB Airsuspension The steel construction is in the final phase. We hope to be able to complete the project at the end of January
read more
La Vie Berlijn
To guarantee the continuity of production and delivery, as well as the quality of the fencing for this work, a permanent production team has been appointed who has focused on the manufacture of these fencing. The team produced this assignment
read more
Lidl Eibergen
Commissioned by Ten Brinke Bouw, we took care of the delivery and assembly of the steel construction for the Lidl in Eibergen. It was built on the site that was known as "the Eibergen hole". We are very pleased with
read more
Canönde Erfstadt
For the company Canönde Tiefbau in Erftstadt we have built 3 halls on the new premises. The halls covered a total area of 1832 m2. Included in the order was the statics of the foundations and the steel structure. Delivery
read more
Boels Rental Bamberg
At the beginning of June we started with the foundations of the hall and the foundation work for the laundry room of the rental center. This was followed by the assembly of the steel structure and the prefabricated concrete base.
read more
L’Osteria 3.0 Freestander Dortmund
In May 2019 we celebrated the opening of L'Osteria 3.0 Freestander in Dortmund. For this we have done the following; the roof truss construction with trapezoidal sheet metal covering. Substructure of the air conditioning with double-sided blinds of aluminum slats.
read more
Breuninger Sachsenheim
On behalf of Ten Brinke Wohn- und Gewerbebau Doetinchem we have built various steel structures for a new logistics center in Sachsenheim. A three-storey T-shaped hall complex is planned. In this complex is an automated storage area for small parts,
read more
Anklaar Apeldoorn
Commissioned by Ten Brinke Bouw B.V we have built 3 large steel structures on top of the parking basements with connections to the houses and shops. We also had the Tapis Roulant Passage and the lift structure in our order.
read more
Hornbach Duiven
At the Nieuwgraaf in Duiven, we have been commissioned by Ten Brinke Bouw Doetinchem to assemble the new steelconstruction (700 ton) of Hornbach Duiven. Subsequently, the assembly team will start assembling the hardware store and then the Drive inn. Here
read more
Toom Hof
Imetaal Industriebau commissioned us to assemble the steel structure for a new construction market in Hof Germany. The construction market has an area of approximately 5,400 m2. It also has a hot and cold hall of approximately 900 m2. (which
read more
Kaffeerösterei Tempelmann Marl
In September 2016 we were commissioned by Ten Brinke Industrie- und Gewerbebau GmbH & Co. KG. to start with the delivery and assembly of the steel structure for the new Kaffeerösterei Tempelmann project in the northern Ruhr area in the
read more
Building 1931 Amsterdam
At the end of 2017 we started with the assembly of the steel construction and the channel plates of the ground floor at the former Citroën building (South). During the year 2018, the assembly was advanced floor by floor and
read more
Ecodome
The sustainable steel construction for the Ecodome has been supplied by Imetaal Staalbouw. The Ecodome is an innovative construction with a diameter of 21 meters and a height of ten meters and is full of all kinds of technical and
read more
Orion College
The school building, a former pastry school, has been renovated and expanded with a new-build section containing a gym, extra teaching rooms and an outdoor area. The gym is housed in the cantilever that extends over the existing school building.
read more