La Vie Berlijn
Description
To guarantee the continuity of production and delivery, as well as the quality of the fencing for this work, a permanent production team has been appointed who has focused on the manufacture of these fencing. The team produced this assignment in a specially equipped workshop separate from our normal production area.
At this large construction site with few square meters of work space, our assembly team always manages to maneuver the fencing over the buildingsite and then assemble it.
Building a great result together.Our contribution: 20 staircases, balconies, French balconies (around 800), balcony railings (2,800m1), Berüstungsgeländer (1,000m1)

Project information
Address
Marienfelder Allee
12277
Year
2014
Quantity
5500 Meter
Additional information
Item number
170098
Type
Category
Involved companies
Imetaal Staalbouw