AIM Markgröningen
Description
In Markgröningen we had to install 2 front roofs with a span of the beams of 15 meters.
It was quite a challenge to connect the 15 meter long tie rods at the right angle to the 4.8 ton HEM 650 girders.
Together with the help of 2 mobile cranes, our Imetaal mechanics had to assemble these assembly canopies from the aerial platforms.
Thanks to all who contributed to this project.

Project information
Address
Steinbeisstraße 6
71706
Year
2021
Quantity
± 127 ton
Additional information
Item number
155002
Type
Category
Involved companies
Imetaal Staalbouw